Abstract

The condition of the coal pillars remained in the room-and-pillar gobs is complicated. The stresses loaded on the pillar floor may be transmitted and overlapped. It changes the stress environment of the lower coal seam roof, leading abnormal periodic weighting. In the procedure of coal seam 3−1 mining in the Huoluowan Coal Mine, the ground stress is high while the working face passing through the room pillars of overlying coal seam 2−2, leading to hydraulic shield being broken. In this paper, theoretical analysis, numerical calculation, and similar material simulation were used to analyse the stress environment of lower seam and the effect of coal pillars remained in close-distanced upper seam. The stress transfer model was established for the room pillars of coal seam 2−2, and the stress distribution of underlying strata was obtained based on theoretical analysis. The joint action of dynamic pressure of high stress-coal pillar with movement of overlying rock strata in the working face 3−1 under the coal pillar was revealed. The results showed that the horizontal stress and vertical stress under the large coal pillar of the room gob in coal seam 2−2 were high, being from 9.7 to 15.3 MPa. The influencing depth of vertical stress ranged from 42 m to 58 m. The influencing depth of horizontal stress ranged from 10 to 23 m. The influencing range of the shear stress was from 25 to 50 m. When the working face 3−1 was mined below the coal pillar of 20 m or 50 m, abutment pressure was relatively high. The stress concentration coefficient reached 4.44–5.00. The dynamic pressure of the working face was induced by the stress overlying of the upper and lower coal seams, instability of the inverted trapezoid rock pillar above the coal pillar, and collapsing movement of the roof. The studying results were beneficial for guiding the safety mining of the coal seam 3−1 in the Huoluowan Coal Mine.

Highlights

  • In the shallow buried coal seam mining, the overlying strata have one single key stratum. e main roof can hardly form a stable voussoir beam structure

  • The periodic weighting generated by one key strata caving is not large, but the periodic weighting induced by the simultaneous caving of two key strata may be great, which generates great pressure on the hydraulic shields in the working face. at is, roof caving behaviour has great influence on the ground subsidence and the stability of the hydraulic supports [1, 2]

  • The underlying strata may experience stress concentration, unloading or circular loading, which leads to various deformations or even fracturing of the lower seam [10,11,12,13]. e stress change of lower seam may cause gas emission and absorption, Shock and Vibration affecting gas migration [14,15,16,17], which may induce dynamic disasters [18, 19]. e remaining coal pillars with different dimensions lead to different the stress concentration factors on the floor, which generates the variation of the stress environment in the lower coal seam [20]

Read more

Summary

Introduction

In the shallow buried coal seam mining, the overlying strata have one single key stratum. e main roof can hardly form a stable voussoir beam structure. In close-distanced multiple coal seams mining, the room gob was formed in upper coal seam when the room retreat mining method was used It has great influence on the stress condition of overlying strata of the lower coal seam. E different caving periods of the upper and lower cantilever beams would induce different periodic distances and abutment pressures, which is the main reason for the overloading of the shield supports at the working face. For the stress transfer rule of the coal pillar floor, the influence of the remained coal pillars in the gob on the floor stress and energy distribution were studied based on theoretical analysis and numerical simulation methods [28,29,30,31].

Influence of Coal Pillars on the Upper Seam Gob
Numerical Simulation
Similar Material Simulation Study
Conclusions
Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.