Abstract

The cost, complexity, lack of filling space and time create challenges in the longwall backfill operation, resulting in poor subsidence control and reduced productivity. This paper proposes an automated continuous mining and continuous backfill (CMCB) method by examining its key requirements and investigates the optimum sequence of coal panel (such as drifts) excavation to ensure ground strata control at relatively high productivity. The automated CMCB adopts the highwall mining technique underground, which enables easier automation at the workface. A numerical simulation of the Changxing coal mine in China was undertaken, and five different sequences of coal excavation were investigated, using the automated CMCB excavation parameters (assuming a 4 m width cut, 5 m mining height for a 200 m long coal slice) to determine the optimum sequence of resource excavation. The plastic zones and vertical displacement across the five models were analyzed. Simulation results of the 5 m high coal seam excavation show that the odd-even slice (OES) mining sequence, which has a vertical ground displacement of 74 mm, is the most efficient excavation method, due to its effective stress redistribution and lower induced ground displacement.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call