Abstract

AbstractThis paper presents a case history of the successful application of observational method to instruction microtunneling with successive pipe-jacking. The microtunneling project is the construction of four parallel pipes under Guan River in Jiangsu, China. Four parallel tunnels with external diameter of 4,160 mm and horizontally spaced at 4.8 m apart were jacked over 450 m in cemented silty clay and sand by two slurry-balance microtunnel boring machines (MTBM) at a depth of 4.6 m under the river bed. Since the overburden soil is very thin, proper control of tunneling operations was of utmost importance for maintaining the stability of the river bed. In order to optimize the operation parameters prior to construction under the river bed, a field trial was conducted, which included measurement of ground surface settlement, subsurface settlement, and lateral displacement of the subsurface soils, as well as excess pore water pressure and earth pressure. The relationship between ground response and const...

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.