Abstract

AbstractThe EPB shield tunnelling for mass rapid transit (MRT) Line 1 of Ho Chi Minh City (HCMC) is the first tunnel excavation in Vietnam to use a tunnel boring machine (TBM). A comprehensive instrumentation programme was developed for safety control and to obtain a better understanding of the characteristics of induced ground movement and the forecasts. The observed ground surface settlement is summarized and interpreted with respect to the tunnelling operation parameters. The settlement trough is compared with the forecast data by applying the empirical Gaussian function and numerical 2D finite‐element analysis (FEA). The trough width parameter in the city's sandy subsoil is determined. The relation between the volume loss of the ground surface and that of the tunnel (contraction ratio) is identified. The result of the investigation is useful for future shield tunnel projects in HCMC and elsewhere in Vietnam.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.