Abstract

The purpose of this study was to document construction procedures, monitor field performance, and make recommendations as to the effectiveness and future use of stone column and wick drains for ground modification purposes. This project involved the use of wick drains to accelerate consolidation in bridge approach foundations and stone columns to improve foundation support for reinforced soil walls supporting bridge abutments. This effort was executed by use of field inspections, photologs, and instrumentation to monitor field response. Instrumentation included earth pressuremeters, multipoint settlement gages, slope inclinometers, settlement platforms, and piezometers. Wick drain performance was satisfactory. One reinforced soil wall failed and the other was marginally stable. The failure appears to be the result of a combination of a weak foundation layer that was disturbed by stone column construction, high foundation pore pressure, and rapid wall construction.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.