Abstract
Guy F. Atkinson Construction Company of South San Francisco recently completed construction of the 20.2 MW Grizzly Hydropower Project, which was commissioned in November, 1993 after three years of seasonal work. Design and construction management was provided by the northern California utility giant, Pacific Gas & Electric (PG&E). This article details contractual issues, geology, TBM tunnel drive, gripper thrust, and final support.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Rock Mechanics and Mining Sciences and Geomechanics Abstracts
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.