Abstract

AbstractThe Grimsel Test Site owned and operated by Nagra is located in the Swiss Alps (www.grimsel.com). The Sixth Phase of investigations was started in 2003 with a ten-year planning horizon. With the investigations and projects of Phase VI the focus has shifted more towards projects assessing perturbation effects of repository implementation and projects evaluating and demonstrating engineering and operational aspects of the repository system. More than 17 international partners participate in the various projects, which form the basic organisational “elements” of Phase VI. Scientific and engineering interaction among the different projects is ensured via an annual meeting and several experimental team meetings throughout the year. On-going projects include: evaluation of full-scale engineered systems under simulated heat production and long-term natural saturation (NF-Pro/FEBEX), gas migration through engineered barrier systems (GMT, finished this year), emplacement of a shotcrete low-pH plug (ESDRED/Module IV), testing and evaluation of standard monitoring techniques (TEM).Numerous in-situ experiments with inactive tracers and radionuclides were successfully carried out over the past few years at the Grimsel Test Site (GTS). For the GTS Phase VI, three major projects have been initiated to simulate the long-term behaviour of contamination plumes in the repository near-field and the surrounding host rock:•The CFM (Colloid Formation and Migration) project, which focuses on colloid generation and migration from a bentonite source doped with radionuclides•The LCS (Long-Term Cement Studies) project, which aims at improving the understanding of low-pH cement interaction effects in water conducting features•The LTD (Long-Term Diffusion) project, which aims at in-situ verification of long-term diffusion concepts for radionuclidesAs Phase VI approaches its mid-term point, what are the next steps planned? The accomplishments assessed to date and the opportunities with the on-going projects as well as new projects – currently under discussion – are presented herein

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.