Abstract
To resolve the instability problem of the current vector control strategy in the converter station of Shizhou when an N-2 fault occurs during the maintenance of Enshi power grid in Chongqing-Hubei Back-to-Back HVDC project (referred to as “Chongqing-Hubei project”), a new grid-support control strategy is proposed in this research. This strategy simulates the characteristics of the synchronous generator to generate its phase. By adjusting the phase and amplitude of the output voltage, it can flexibly adjust the output of active power and reactive power and realize the frequency and voltage support of the power grid. At the same time, it solves the problem of DC instability when the AC power grid is disturbed and ensures the stable operation of the system. PSCAD/EMTDC simulation test and application in Chongqing-Hubei engineering field verify the effectiveness of this strategy. The grid-supporting control strategy provides technical support for weak system access, inertia compensation and voltage support in the future new energy field.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.