Abstract

Scheduling optimization depends not only on resources selection but also on time sequence correlatively in grid.After the time sequence characteristics in resource reservation were analyzed,a dynamic time model was presented,in which the back-free-time was calculated for applying to the subsequence task.Thus,a Back-free-time Optimization Scheduling(BOS) algorithm was proposed.Finally the performance of BOS algorithm was compared with that of the cost optimization scheduling algorithm through simulations.Experimental results show that the back-free-time optimization scheduling algorithm can decrease runtime and cost within grid environments.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.