Abstract

As the proportion of renewable energy access to the grid increases, regional phenomenon of wind power and photovoltaic curtailment highlights. In order to improve the capacity of new energy consumption and alleviate the complexity of power grid scheduling, a regional power grid scheduling domain partitioning method for high proportion of renewable energy access is proposed. The renewable energy regional grid operation domain is divided into normal domain, abnormal domain and emergency domain, and combined with the regulation capability of conventional thermal power units and the power fluctuation ability of energy storage, the divide indicators of each operation domain is defined. Finally, an example analysis of the Dalian regional power grid in Liaoning is carried out to verify the validity and correctness of the grid multi-domain division method.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call