Abstract
In this paper, a meta-heuristic optimization algorithm has been applied to interconnected Hydro-thermal power system for automatic generation control (AGC). The optimal gains of the fuzzy based proportional, integral and derivative (PID) controllers are obtained by employing the proposed Grey Wolf Optimizer (GWO) algorithm. The generation rate constraint of 3% per minute for thermal power plant and 270% up and 360% down per minute for hydro plant have been considered. The dynamic performance of a two-area interconnected Hydro-thermal power system is investigated and compared with particle swarm optimization (PSO) and differential evolution (DE) techniques by incorporating a Thyristor Controlled Phase Shifter (TCPS) in series with the tie-line. The overall performance of the considered system has been significantly improved by controlling the phase angle of TCPS with the help of proposed Fuzzy PID controller. It is revealed that the frequencies of both area and tie-line power oscillations are quickly damped out by the proposed scheme under step load perturbations. Furthermore, the robustness of the proposed system is analysed when subjected to different loadings without recalculating the gains of the controller.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.