Abstract

The Greensand project includes, beside from safe and efficient geological offshore CO2 storage, offshore transport by ship and/or pipeline of CO2 from key side onshore facilities established to capture, liquefy, onshore transport and temporarily store the CO2 before offloading to storage site. The Greensand project builds on the usage of the offshore Siri complex sandstone reservoirs no longer in use for oil and gas production. The storage sites, offloading and injection systems and transportation means are currently being technically matured. The target is to be able to offer customers safe and reliable transport and storage services from the start of 2026. Currently meanwhile maturing a technical concept, commercial and regulatory activities are ongoing in parallel. The Greensand partners INEOS Energy and Wintershall Dea have also decided to perform an offshore pilot test of injecting liquified CO2 into a particular reservoir serving as candidate for future long terms storage of CO2. Along the pilot testing offshore project, material testing and deployment of monitoring techniques are being matured. The Pilot testing offshore planned to take place late 2022 with a 3-months duration.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.