Abstract

Abstract The Dutch Ministry of Spatial Planning and the Environment (VROM) engaged Jacobs Consultancy to develop a definition and measuring tool aimed at quantifying the CO 2 Capture Readiness of a combustion plant. The tool developed tests the level and completeness of pre-project execution information. The testing of pre-project information is a standard practice in the refining and petrochemical industry and Jacobs Consultancy has adapted and tailored these practices to develop the Capture Readiness tool. The tool was developed in 2008 and was pilot tested on two already permitted coal fired power plant projects in 2009. The Capture Readiness tool is similar in concept to the well known Project Definition Rating Index originally introduced by the Construction Industry Institute for Major Capital Projects. The tool quantifies the readiness of a project to accommodate future CO 2 capture and parallels the phased approached to Major Capital Projects used by the Project Definition Rating Index. A short introduction to the application of the PDRI methodology to test the completeness of the project development information–often also referred to as Front End Loading or FEL, is included in this paper to establish the parallel approach we have used in the development of the Capture Readiness tool. The Jacobs Consultancy Capture Readiness tool is then discussed in more detail.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call