Abstract
The sewage treatment system is upgraded from the original UNITANK process to A2O+MBR process and pharmaceutical sewage treatment process. The automatic control system involves the problem of combining with the original automatic control system. The design is based on advanced nature, flexibility, reliability, and ease of use. The principle of scalability, the control project covers all technological processes, can realize the centralized monitoring of the central control room of the whole plant equipment, and effectively improve the automation of sewage treatment. Through the project budget, the total cost of different processes and different scales of treatment schemes is obtained, and the functional relationship between the cost and scale of different processes is obtained through curve fitting. According to the principles of technical economics, the cost of the sewage treatment project is related to the quantity of reduced pollutants, and the cost flow of the project and the reduced pollutant load flow are discounted.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Earth and Environmental Science
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.