Abstract
The needs for improving observability of medium and low voltage distribution networks has been significantly increased, in recent year. In this paper, we focus on practical approaches for placement of affordable Measurement Devices (MDs), which are providing three phases voltage, current, and power measurements with certain level of precision. The placement procedure is composed of a state-estimation algorithm and of a greedy placement scheme. The proposed state-estimation algorithm is based on the Distflow model, enhanced to consider the shunt elements (e.g., cable capacitances) of the network, which are not negligible in low voltage networks with underground cables. The greedy placement scheme is formulated such that it finds the location of minimum required number of MDs while certain grid observability limits are satisfied. These limits are defined as the accuracy of state-estimation results in terms of voltage magnitudes and line currents over all nodes and lines, respectively. The effectiveness of the proposed placement procedure has been validated on a realistic test grid of 10 medium voltage nodes and 75 low voltage nodes, whose topology and parameters were made available from the Distribution System Operator (DSO) of the city of Geneva, Switzerland.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.