Abstract

The traditional network scheduling methods such as the Critical Path Method (CPM), Programme Evaluation Review Technique (PERT), and bar charting are typically not effective for the planning of linear construction projects. Linear scheduling methods, on the other hand, model the progress of repetitive activities in sloping lines and are more effective for linear modelling and analysis. Nonetheless, their use in the construction industry has so far been very limited. Among other reasons for this is the unfamiliarity of construction personnel with these techniques, which plays a major role in hampering their application. This paper introduces a graphically based approach to assist in the linear programming (LP) modelling of linear scheduling analysis. The Planning & Optimization for Linear Operations (POLO) system provides a graphic LP modelling environment in which model formulation can be easily accomplished in a graphic and interactive fashion. Thus, the application of linear scheduling methods can be facilitated. The Isle of Palms Connector Bridge project in Mount Pleasant, South Carolina is used to demonstrate the use of the system.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.