Abstract

Small medium industries (SMIs) routinely face supply variations in their production cycle. Such firms are typically characterised by limited resources and insufficiency of funds. Thus, SMIs need simple solutions to cope with the production planning issues. Pinch analysis has been proven as a strategy for planning of efficient use of scarce resources. Recently, it has been extended to various production planning problems. In this paper, a simple novel graphical approach is proposed to address two common production planning problems in SMI's, which are warehouse space allocation and production capacity planning. Two industrial case studies are shown in this paper to illustrate the proposed approach.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.