Abstract

PurposeThe purpose of this paper is to propose the use of graph theoretic structural modeling for assessing the possible reduction in complexity of the work flow procedures in an organization due to lean initiatives. A tool to assess the impact of lean initiative on complexity of the system at an early stage of decision making is proposed.Design/methodology/approachFirst, the permanent function-based graph theoretic structural model has been applied to understand the complex structure of a manufacturing system under consideration. The model helps by systematically breaking it into different sub-graphs that identify all the cycles of interactions among the subsystems in the organization in a systematic manner. The physical interpretation of the existing quantitative methods linked to graph theoretic methodology, namely two types of coefficients of dissimilarity, has been used to evolve the new measures of organizational complexity. The new methods have been deployed for studying the impact of different lean initiatives on complexity reduction in a case industrial organization.FindingsThe usefulness and the application of new proposed measures of complexity have been demonstrated with the help of three cases of lean initiatives in an industrial organization. The new measures of complexity have been proposed as a credible tool for studying the lean initiatives and their implications.Research limitations/implicationsThe paper may lead many researchers to use the proposed tool to model different cases of lean manufacturing and pave a new direction for future research in lean manufacturing.Practical implicationsThe paper demonstrates the application of new tools through cases and the tool may be used by practitioners of lean philosophy or total quality management to model and investigate their decisions.Originality/valueThe proposed measures of complexity are absolutely new addition to the tool box of graph theoretic structural modeling and have a potential to be adopted by practical decision makers to steer their organizations though such decisions before the costly interruptions in manufacturing systems are tried on ground.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.