Abstract

This paper proposes a graph computing based mixed integer programming (MIP) framework for solving the security constrained unit commitment (SCUC) problem in hydro-thermal power systems incorporating pumped hydro storage (PHS). The proposed graph computing-based MIP framework considers the economic operations of thermal units, cascade hydropower stations and PHS stations, as well as their technical impacts towards the network security. First, the hydro-thermal power system data and unit information are stored in a graph structure with nodes and edges, which enables nodal and hierarchical parallel computing for the unit commitment (UC) solution calculation and network security analysis. A MIP model is then formulated to solve the SCUC problem with the mathematical models of thermal units, cascade hydropower stations and PHS stations. In addition, two optimization approaches including convex hull reformulation (CHR) and special ordered set (SOS) methods are introduced for speeding up the MIP calculation procedure. To ensure the system stability under the derived UC solution, a parallelized graph power flow (PGPF) algorithm is proposed for the hydro-thermal power system network security analysis. Finally, case studies of the IEEE 118-bus system and a practical 2749-bus hydro-thermal power system are introduced to demonstrate the feasibility and validity of the proposed graph computing-based MIP framework.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.