Abstract

Lead time—the duration of construction and commissioning—is an important determinant of the capital cost of nuclear power plants (NPPs). For an industry dominated by a handful of multinational firms, the degree of cross-national variation is surprising. NPP lead times have historically trended upward over time in Western nations, and yet they are comparatively quick and stable in East Asia. I theorize that the institutional capacity and autonomy of subnational governments can partially explain these patterns in the data. Having assembled a novel data set on the design specifications of the global population of NPPs, I empirically document a positive association between political decentralization and NPP lead time that is not explained by observed cross-country differences in NPP design. The results are suggestive of the hypothesis that political decentralization creates conditions that slow NPP construction for nontechnical reasons. However, the findings are not robust to certain robustness checks and fail to rule out the possibility that unobserved differences in design explain this association.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.