Abstract
The difficulties to build new power lines within the national territory cause of authorization problems, and the ever more growing production of electricity from renewable sources, induces Term S.p.A. (Italian TSO) to take advantage of existing overhead transmission lines. Therefore, in order to increase the transmission capacity, and to optimize the maintenance and management of power lines, for some years Terna has been using a software in GIS environment (Geographic Information System) that referring to the LIDAR (Laser Imaging Detection and Ranging) remote sensing technology, allows to manage the interferences according to all the requirements and legislative bonds and to fulfill the imposed obbligations related to the electric and magnetic fields. This paper after the description of GIS systems and LiDAR technology shows the calculation of the current capacity of some High Voltage power lines within the Sicilian territory, in order to ensure the verification of sag imposed by Italian law, using the conductor thermal model.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.