Abstract

A previous small systems helpdesk column outlined the importance of requiring as‐built plans to be part of any utility's construction projects (December 2001). This month's column outlines how a geographic information system (GIS), used in conjuction with a global positioning system (GPS), can be more reliable as an alternative to as‐builts.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.