Abstract

Taking the reinforcement and maintenance project of a concrete cable-stayed bridge as the background, aiming at the stress cracks on the web of the box girder of the main bridge after several years of operation, starting from the actual situation of design and construction, the integral calculation model of the bridge is established by Midas Civil and the local analysis and calculation model of the main girder is established by the general finite element software. Four kinds of analysis and calculation models are analyzed. Finally, it is shown that the web cracks of the bridge are caused by the cable tension when the bridge is cantilevered. On this basis, the concrete and feasible bonded steel plate method is proposed to repair and strengthen the cracks, which is of certain reference significance for the reinforcement and maintenance of the same type of bridge cracks in the future.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.