Abstract
Geomagnetic disturbances (GMDs) threaten the secure and reliable operation of the electric power grid. During a GMD, geomagnetically induced currents (GICs) cause additional reactive power losses and a lowered voltage profile. Preventing and mitigating a widespread system collapse in such an occurrence requires accurate knowledge of the current system state. This is provided by power system state estimation, but as traditional methods do not account for GIC-related monitoring and modeling, they may fail to provide accurate results during a GMD. Therefore, in this work excess reactive power losses are explicitly modeled in the state estimation method and GIC-related values are included among the states and measurements. The modeling scheme is thoroughly discussed and estimation results on a 20 bus and 150 bus case validate the estimation accuracy improvement provided by a GIC-inclusive modified state estimator during a GMD.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.