Abstract

Large hydroelectric dams are major drivers of habitat loss and degradation in lowland Amazonia. Hydroelectric reservoirs reduce the habitat available for terrestrial species, but create new open-water and shoreline lake habitat that can potentially boost populations of aquatic and semi-aquatic species, such as the threatened giant otter (Pteronura brasiliensis). To assess the impacts of mega-dams on this apex-predator, we surveyed the giant otter population across the 443,772-hectare Balbina Hydroelectric Reservoir of central Brazilian Amazonia between 14 and 25years after this reservoir creation. We compared changes in habitat area and estimated giant otter population size between the reservoir pre- and post-filling stages. The Balbina dam created ∼3525 islands and increased the open-water surface and total reservoir perimeter available to otters by a factor of 62.7 and 8.9, respectively. Some 25years after damming, however, the estimated post-filling giant otter population size was only twice greater than that estimated before filling and 4.5 times smaller than would be predicted given the total available habitat area and density of dens quantified at a neighbouring undisturbed area used as a surrogate of the pre-filling phase. The observed mismatch between the proportional increase in otter population size and the much greater newly available reservoir habitat area is likely due to low habitat quality in terms of low fish prey productivity and scarcity of suitable sites for denning and territory demarcation. This should be considered in strategic environmental impact assessments of planned hydroelectric dams and in managing existing and future hydropower development in lowland tropical forests.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call