Abstract

Geotechnical surveys in the area of the Ena Tunnel have being carried out by Japan Highway Public Corporation from 1965. In the area of Nakatsugawa, the west side of the Ena Tunnel, 5 boring works were completed, and several physical characters of boring cores and bore holes were tested and measured.From their resul ts, the geotechnical section of the west side of this tunnel is drawn. Considering difficulty of boring works and observation of boring cores, it seemed that geotechnical conditions in this area is not desirable for tunnel work beyond expection

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.