Abstract

The geotechnical monitoring played an important role in guiding the tunneling applications during the construction of IZMIR LRTS (Light Rapid Transit System) 1st stage. The purpose of this paper is to review the deformation measurements and results gathered during the construction of LRTS 1st stage tunnels. The New Austrian Tunneling concept (NATM) was used for the construction of Ucyol–Konak conventional tunnels of the system. The EPBM (Earth Pressure Balance Method) concept used in the construction of Konak–Basmane precast segmental tunnels. Both tunneling concepts required monitoring of deformations during construction as well as for a period after its completion.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.