Abstract

The short line match-cast method of precast segments has proved to be the most versatile and reliable way to concrete bridge construction. The success of match-cast method relies heavily on accurate geometry control in precasting as the scale of adjustments during erection is very small and difficult to implement. So the required levels of accuracy in segments match-casting are stringent in order to assure erection accuracy. Therefore, the research on segments match-casting and geometry control technique of space distorted segments are very important.Based on the principle of match-casting using the short-line method, the geometry control technology of transition curve section in cross-sea bridge erected by precasting segment girder is proposed. As an example of south approach spans in north branch of Xia-zhang Cross-sea Bridge, this paper will provide a reference for the construction of similar bridges.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.