Abstract

AbstractProceedings of the 58th Geomechanics ColloquiumGrouting in RockJ. Linortner, G. Jung & G. Zenz: Design and construction of the grout curtain for Ermeneck HPP DamI. Reichl, J. Seegers, M. Lotter & N. Prosser: Ground improvement in carstic rock (Irlahüll Tunnel, DB Nürnberg‐Ingolstadt)A. Vigl & R. Gerstner: Grouting of pressure tunnels for Hydro Power PlantsB. Stille, H. Stille, G. Gustafson & S. Kobayashi: Experiences with a ”Real Time Grouting Control Method”K. Breit: Complex grouting projects in Austria and abroad; a Contractor's view R. Pollard: The use of TPA at the Dounreay shaft isolationProjects in AustriaP. Schwab, B. Präsent & J. Dissauer: Motorway Bruck S35 BL22 ”Tunnel excavation in serpentinite”C. Gamper: H8 Tunnel Jenbach, Brenner railway axis northern feeder line to the Brenner Base Tunnel, hydroshield excavationH. Westermayr, M. Höllrigl, J. Daller & V. Mihailov: Construction of the 2nd tube of the Pfänder Tunnel by tunnel boring machine (TBM)K. Czopak & E. Neumüller: Contract LT 33 Tunnelling in hard rock on the middle section of the new Lainzer Tunnel in ViennaH. Goldberger & A. Stärk: Lainzer Tunnel Lot LT31 – side wall drift in ViennaM. Bauer, F. Püringer & M. Eder: Tram Line Harter Plateau – Tunnelling beneath Linz Central StationDeep TunnelsM. John & B. Mattle: Review of determining rock mass behaviour for tunnels with high overburdenA. Preh & R. Poisel: Cherry pit failure of tunnels – new understanding of the failure mechanismS. Kainrath‐Reumayer, G. Gschwandtner & R. Galler: The convergence‐confinement‐method as an auxiliary tool for the design of deep tunnelsN. Radoncic, W. Schubert & B. Moritz: Ductile lining design G. Lombardi, M. Bettelini, M. Neuenschwander & A. Pancierer:Gibraltar tunnel: design update and geomechanical challengesJ. Gollegger, M. Rausch & A. Priller: Application of open TBMs under squeezing ground conditions in the Gotthard Base TunnelG. Harer, D. Handke& L. Herwig: Tunnelling methods for zones of squeezing rock mass behaviour at the KoralmbahnReuse of Tunnel Excavation MaterialD. Resch, R. Galler, F. Ebner & K. Lassnig: Excavation material in tunnelling – High quality raw material?R. Lieb: Material management at the Gotthard Base Tunnel – findings from 15 years of experienceG. Harer & P. Pichler: Effectively decreasing the requirement for landfill sites at the Koralmtunnel – SolutionsA. Fromm, B. Schreitl & C. Kitzler: S1 Tunnel Donau‐Lobau – Recycling the excavation materialH.‐G. Haid, H. Hammer: Katzenbergtunnel – conditions for recycling excavation material from the environmental and authorization point of viewJ. Burdin: Material management for the project Lion‐Turin‐RaillinkK. Mittermayr, M. Steiner & W. Ramspacher: A26 – excavation material, transport, recycling

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call