Abstract

The strain analysis procedure is discussed in terms of a vertical mine shaft under the impact of extraction of ore reserves from protective pillar in Oktyabrsky mine of NorNickel’s Polar Division. The procedure is used in predictive strain analysis in depth of the shaft in case of different scenarios of protective pillar mining in ventilation shaft No. 3. The calculations show impossibility of preservation of shaft VS-3. Based on the prediction, it was decided on the early analysis of ventilation alternatives in the mine without involvement of shaft VS-3. The implemented research saved significant assets from spending on the shaft maintenance in the period of extraction of ore reserves from the protective pillar. Moreover, the time allowance until disability of shaft VS-3 enables scheduled planning and construction of access gateways to ensure the required ventilation mode in the mine. The authors appreciate participation of D. A. Kotikov, S. Yu. Shilenko, V. V. Balandin, M. P. Sergunin, A. V. Kulov, V. N. Andreev and A. K. Ustinov in the study.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.