Abstract

Abstract In order to obtain minimum amount of ore wastage and maximum profitability in dimension stone quarries an optimal short-term production planning procedure has been established here according to the market demand. As the base of this procedure geological modelling has been first created and smoothing of ore-body boundaries was done. Then, an economical block model has been provided. In the next step, all probable shapes of minable-blocks were specified and their priorities in assignment were done according to desired size of the blocks by market demand. Finally, searching from a base sub-block was started in order to find the optimal plan. The procedure has been used for a dimension marble quarry located in northwest of Iran. It demonstrates a decrease about 26% of ore wastage and 21.3% of diamond wire assumption with comparing to the existent traditional procedure.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.