Abstract
Lime-treated cohesive soils are used extensively as the construction materials of road embankments. In some cases, vertical embankment is needed, rendering the necessity to employ retaining walls backfilled with lime-treated cohesive soil. In China, geogrid-reinforced lime-treated cohesive soil retaining walls are increasingly used for this purpose. With the objective to reveal the behavior of this type of structure under working-stress condition and to shed light on its future application, a 6.0 m reinforced soil retaining wall was monitored for two years during and post construction. The results showed that the lime-treated soil carried the majority of the gravity load but the geogrid reinforcements also contributed to the integrity of the embankment. Under gravity loading, the backfill deformation was mainly elastic. Backfill compaction during construction was the critical factor influencing the reinforcement deformation and lateral earth pressure at the back of the facing, the latter of which decreased with time after the end of construction due to the increases of both backfill strength and facing displacement. Based on these results, it is inferred that under working stress condition, lime-treated backfill plays a major role in the stability of the retaining wall, while geogrid reinforcements play a secondary role.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.