Abstract

The results of the statistical retrospective analysis of the officially recorded geodynamic events in mines of Apatit Company within the Khibiny Massif are presented. The risks and aftereffects of geodynamic events have been calculated. Under discussion are the results of three calculation variants taking into account the scale of human impact on rock mass. The analysis shows that the main damage due to geodynamic events is different-degree destruction of mine workings while the remaining aftereffects account for less than ten percent. That is, the geodynamic risk in apatite mines can be identified as technological.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.