Abstract

This paper presents a new mathematical programming model for the bi-criteria mixed-model assembly line balancing problem in a just-in-time (JIT) production system. There is a set of criteria to judge sequences of the product mix in terms of the effective utilization of the system. The primary goal of this model is to minimize the setup cost and the stoppage assembly line cost, simultaneously. Because of its complexity to be optimally solved in a reasonable time, we propose and develop two evolutionary meta-heuristics based on a genetic algorithm (GA) and a memetic algorithm (MA). The proposed heuristics are evaluated by the use of random iterations, and the related results obtained confirm their efficiency and effectiveness in order to provide good solutions for medium and large-scale problems.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.