Abstract

The aim of this paper is to propose tools to adapt and parameterize the Material Requirement Planning (MRP) method under lead time uncertainty. We study multi-level assembly systems with one type of finished products and several types of components. We consider that each component has a fixed unit inventory cost and the finished product has a backlogging cost per unit of time. The lead times of components are discrete random variables, and the costumer's demand of the finished product is known. A general mathematical model for supply planning of multi-level assembly systems is presented. A Genetic Algorithm (GA) method is proposed to minimize the sum of the average inventory holding cost for components and the average backlogging and inventory holding costs for the finished product.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.