Abstract

AbstractThe discrete time-cost trade-off problem (DTCTP) is a multiobjective problem usually encountered in practical projects. Current optimization methods for this problem in repetitive construction projects often assume that there is only one work sequence between units. In practice, however, the work sequence is not necessarily unchangeable. Scheduling with variable work sequences is known as the soft logic method. This study develops a mathematical model considering soft logic to address the DTCTP in repetitive construction projects. The objective is to select a set of activity modes, start times, and work sequences between units such that the total cost is minimized while meeting a given deadline. A targeted genetic algorithm is also presented, in which only the activity modes and work sequences between units are encoded, and suitable start times of all subactivities are then determined using a linear programming approach. Two example projects are analyzed, and their computation results support that...

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.