Abstract

Inefficient coordination between decentralized generation investment and centralized transmission planning is a significant barrier to achieving rapid decarbonization in liberalized electricity markets. While the optimal configuration of the transmission grid depends on the relative social costs of competing technologies, existing processes have not led to transmission expansion consistent with declines in the cost of wind and solar combined with increased estimates of the social costs of traditional thermal resources. To break the negative feedback loop preventing efficient network expansion, this paper proposes an inversion of the generator interconnection process in conjunction with modifications in the definition of financial rights connected with transmission service. From a generator perspective, the effect of the proposed reforms is to trade highly uncertain network upgrade and congestion costs for a fixed interconnection fee. From a transmission planning perspective, the goal is to improve the quality of information about new generation included in forward-looking planning processes. Simulation on a stylized two-node system demonstrates the potential of the approach to facilitate a transition to clean technologies.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.