Abstract
This paper describes a new approach for establishing power systems scheduled generators outages for maintenance purposes. The time frame considered refers to power systems short-term operations planning horizon (i.e. one month ahead). The paper's main contribution is focused on modeling grid operational constraints, which are dealt with by a DC optimal power flow. The resulting large-scale optimization problem is solved by mixed-integer programming techniques aided by Benders decomposition strategy. The obtained results clearly show that representing transmission influence is essential for the establishment of a sound set of scheduled outages for the system's generators, especially in the case of hydrothermal systems.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.