Abstract

With types of power units, huge installed capacity and complicated operation modes, the Three Gorges Power Station (TGPS) is very important in network operation of Yangtze River area. Power forecasting of TGPS plays an important role in protecting the power network operation and shipping, especially for the short-term output forecasting. The water consumption rate of power station is one of the key conditions in short-term generation control system during non-abandon water period. Therefore, in order to develop the generation control scheduling model of TGPS in non-abandon water period, analysis on many factors should be put including: hydraulic turbine characteristic curves of cascade hydropower stations constructed by TGPS and the Gezhouba Power Station; discharge at dam site; water stage of relationship between upstream and downstream; and the last element is tailrace effect from the Gezhouba Power Station to TGPS. The historical operating result shows that the model referred has wide application prospect in production practice for high precision and much exercisable.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.