Abstract

This paper presents site survey processes and the results for installing GBAS Category-I ground system into Gimpo international airport. For siting assessment, many things should be taken into account in advance, such as installation requirement of GBAS components, future airport development plan and possible interference effects to existing facilities. Because overall performance of GBAS system can be affected by GPS signal reception environment, on-site survey should be performed carefully to measure actual GPS environmental performance and determine if any adverse multipath or RFI problems exist or not. In addtion, VDB antenna should be located to ensure line of sight for transmitting VHF signal to deliver GBAS message to aircraft. Based on the survey results, final location for GBAS system installation is selected near runway 32 in the Gimpo airport.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.