Abstract

After the GBAS ground system installing at the airport, a GBAS ground and flight testing must be conducted to verify functionality and performance of the system. Since Korea has no experience of the GBAS ground system installation, GBAS test and evaluation methods have never been studied so far. Therefore this paper analyzes the test items and methods for the GBAS ground and flight testing based on ICAO documents, FAA flight inspection manual and testing reports of other countries. As a result of the analysis, this paper proposes the GBAS ground and flight testing items in korea, also describes the flight procedures for the GBAS flight testing.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.