Abstract

Due to the complex geological conditions of Nanshan mine east region, the outburst predict index overrun frequently in the process of high-dipping extremely thick coal seam rock cross-cut coal uncovering, this text designed and optimized the front explore borehole parameter to ascertain conditions of coal seam; Optimized gas drainage drilling parameters to improve the rate of extraction, reduced the blank tape; On the basis of the theory of mechanics, derivate the computational formula of minimum safety rock pillars, identified with the minimum thickness safety of rock pillars. Through the above measures, guaranteed debunking coal seams quickly and safely.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.