Abstract
Coal seam B1 has characteristics of soft, poor air permeability, high gas content and gas pressure, therefore, there's strong outburst danger in Liangbei Coal Mine. However, the gas control in the coal with lower strength and lower permeability is still in the exploration. Depth of coal roadway is 610-750m at 11 mining area. The roadway excavating speed is seriously influenced by gas outburst, so it brings unfavorable influence to the mine. Based on the principle of relieving gas pressure in the low permeability reservoir, the shortages of existing methods are analyzed for gas control and optimization measure for gas outburst prevention, i.e. "short, flat, long, subtraction, stay, support", put forward from the view of system engineering. With the new measure, drilling efficiency increase, borehole collapse decrease, single borehole drainage scope increase, the gas control meets the requirement and the coal side is easily to be controlled. After application of the optimization technique, the roadway excavating speed is increased from 45m to 70m every month in 11mining area, and the tight situation of excavation replacement is alleviated.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.