Abstract

The main problem of fluid sampling during well testing of reservoirs with near-critical fluids (gas condensate and volatile oil) is due to the fact that even a small pressure drawdown usually leads to the formation of a two-phase mixture in the bottom hole area, and it is almost impossible to take representative samples with downhole samplers or a formation tester. Sampling via test-separator and the current non-separation methods are also imperfect. An alternative method—MIKS (Multiphase IsoKinetic Sampling)—of gas condensate well testing was proposed, which is based on emulsifying a multiphase flow to particles of about 1–10 μm. Thereby MIKS would eliminate the problem of particle slippage in a homogeneous flow and enables high-quality sampling directly from the flowmeter line. The initial formation fluid is characterized by the maximum value of the condensate-gas ratio (CGR). Therefore, first, the well effluent would be adjusted to the mode with the maximum CGR using a choke manifold and a multiphase flow meter. Then the flow mixture is transferred to a by-pass line with an emulsifier to achieve an isokinetic flow. Thereafter, pressure samples can be taken into pressurized sampling bottles, in which thermodynamic conditions are preset according to the flow line. The efficiency of sampling and recombining procedures allows for conducting a study of reservoir samples in the field laboratory directly on the rig and obtaining a complete PVT report even before the completion of drilling and abandonment of the well. An additional economic effect is achieved by reducing the costs of transporting and samples storage. Well test equipment setup becomes much more compact and less weight; the costs of drilling time are reduced, which is viably important for well testing on the Arctic conditions. Another major problem in the development of gas condensate reservoirs is avoiding the condensate banking around producing wells. Optimization of condensate production can be achieved by maintaining the well operation mode at maximum CGR level by means of multiphase flowmeters. The formed condensate bank can be destroyed by a combination of methods—hydraulic fracturing, followed by cycling process—purging the formation with dried gas and/or injection of methanol into the formation. Methanol can be obtained from synthesis gas as a by-product in the utilization of associated gas also at the field. The specified set of measures will allow to revive the GC wells that are losing productivity, as well as to extend the period of high productivity of new wells.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call