Abstract
ABSTRACT This paper reviews the means by which geological uncertainty has been addressed in a complex marginal field development. The Gannet C field development carries a significant element of risk resulting from a challenging drilling environment and large geological uncertainty due to poor structural definition on seismic. By creating extreme high- and low-case structure maps during a re-mapping exercise following completion of the first drilling round, a better grasp of the possible up- and down-sides to the development has been obtained. This case study shows that targeting horizontal wells using high- and low-case scenarios enables the geologist to optimise the well location within the confines of available data and to anticipate and react confidently to the unexpected drilling result.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.