Abstract

Tower crane is increasingly becoming one of the key components of temporary site layout facilities in most construction projects. Determining the location of tower crane is an essential task of layout planning, which is also the central focus of this study. The optimization of tower crane location depends on many interrelated factors, including site constraints, shape and size of the buildings, type and quantity of required materials, crane configurations, crane type, and construction site layout. These factors vary from one project to another, resulting to complicated site layout strategies and approaches. This fact makes the crane location problem impractical to be solved depending on experience of practitioners only which was gained by assuming and through trial and error.This paper aimed at developing an optimization model to solve tower crane location problem in construction sites. The objective was to minimize the total transportation time. Genetic Algorithms (GA) optimization technique is utilized to solve the problem. A numerical example is presented to test and validate the results obtained by the model.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.