Abstract

This chapter specifies the minimum requirements for handling of a project in the detail design and procurement stages; it is regarded as a recommended practice. The main activities for implementation of the detailed engineering, procurement services, and supply of equipment and materials are covered in this chapter. This chapter also includes all activities pertaining to the production of drawings, data sheets, and specifications, covering all technical aspects of the job, including the execution of the studies, analysis, and detailed designs that are necessary to allow the designer to place purchase orders for the supply of equipment and materials, and to award such subcontracts as are planned for fabrication, installation, construction, and pre-commissioning of the facilities. The basis of the Works to be executed during the detailed design phase is the basic engineering design packages and specifications.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call