Abstract
This paper proposes a fuzzy linear programming (LP) based solution approach for the long term multistages best generation mix (BGM) problem considering wind turbine generators (WTG) and solar cell generators (SCG), and CO <sub xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">2</sub> emissions constraints. The proposed method uses fuzzy set theory to consider the uncertain circumstances ambiguities associated with budgets and reliability criterion level. The proposed approach provides a more flexible solution compared to a crisp robust plan. The effectiveness of the proposed approach is demonstrated by applying it to solve the multiyears best generation mix problem on the Korean power system, which contains nuclear, coal, LNG, oil, pumped storage hydro, and WTGs and SCGs.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.