Abstract

Blackout is the severe thing in the whole power system. Restore the power system is a complex thing for the system operators. In Power system restoration process pickup the critical load is the important task in the restoration process. In this distributed generated using to pick up the critical load. DG placements are done by fuzzy logic system using Virtual instrumentation. In this paper this methodology was tested in two load locations with two distributed generation system. DG placement depends upon severity of the damage of power system which restore with less restoration time.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.