Abstract

In Switzerland, the 57 km long Gotthard base tunnel is being built as part of the AlpTransit project with a maximum overburden of 2000 m . Because of the difficult geological situation, an exploratory tunnel was set up to explore the Piora-Mulde, a possibly unstable carbonate rock zone in south Central Switzerland. A geophysical forecast system called tunnel seismic prediction has been designed by Amberg Measuring Technique Ltd. to explore the geology during the tunnelling process. But several difficulties occurred in interpretation of the seismic data in terms of geological forecasts. This paper describes a simple approach to geological interpretation of seismic diffraction stack images by using fuzzy logic. A fuzzy rule-based expert system was developed to classify lithologic and tectonic rock units by interpreting those seismic images.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.